News

Floating Solar and Hydro Power Plant

January 26, 2023
By Administrator

Zeck TSE is proud to have deployed their puller (PUL 01-05) for the installation of sub water cables at the Sirindhorn dam, one of the largest Floating Solar/Hydro power plants.